Available for commercial and industrial sites with expected loads over 2500 Average kW connected to primary distribution or transmission voltage, subject to wholesale power and bulk transmission available capacity. This rate provides a pass through of wholesale energy and transmission costs and collects distribution delivery and general cost-of-service for the Cooperative in a delivery charge.