What permits, inspections or other requirements do you have for a new service?

To save time, all permits required by the Counties we serve (water, sewer, septic, and building) should be secured before requesting service from MEC. Our Engineering Department will need a scaled, detailed, and dimensioned plot plan of your lot to accurately engineer your service. Before MEC will connect your service, your meter base and wiring must be inspected and approved “green tagged” by the Electrical Inspector from the county in which the property is located.